Ih B275 Injector Pump Manual

The Farmall International Diesel Engine Injection Pumps Service / Shop Manual ISS-1003-V contains all the information you need to take apart, repair and put back together your International Tractor. This is a reproduction of the same manual that the factory issued to the Farmall tractor dealers service department. Rotary Style CAV Injection Pump, New, not rebuilt, for: B275, 276, B275, 354, 364, 374, 384 B414, 424, 434, 444. PN 3040869R92, 3044494R92, CAV number 3240F538.

  1. International B275 Injection Pump
  2. Ih B275 Injector Pump Manual Transmission
  3. Ih B275 Injector Pump Manual Diagram
  4. Ih B275 Injector Pump Manual Briggs And Stratton
  5. Ih B275 Injector Pump Manual Parts
Case International Harvester B275 parts UK & Eire. Quality replacement parts for your Case International Harvester B275. In this section you will find aftermarket International B275 spares & accessories of our full International parts catalogue. The International B275 was a utility tractor produced from 1958-1968 in Bradford. Anglo Agriparts stock a wide variety of high-quality classic Case International Harvester B275 parts.
Shop online & buy tractor parts by searching with a part number (OEM ref. determined by the serial number on the clutch housing on the right side of the tractor) or selecting a category from our International Harvester B275 parts list inc: piston rings, engine kits, radiators, hydraulic pumps, starter motors, gaskets, bearings, fuel pumps, water pumps, brakes, clutch, steering, linkage, transmission

Description

This 205 page, International Harvester Diesel Pump 1 & 2 Plunger Service Manual is a reproduction of the original, out of print manual . This manual provides detailed service information, step-by-step repair instruction and maintenance specifications for Diesel Pump 1 & 2 Plunger used on Industrial Equipment such as: TD6, TD9, TD14, TD15, TD18, TD20, TD24, TD25, TD35 and TD40- 817 Engines. ID-6, ID-9 Dsl, ODS-6 Dsl, UD-14 Power Unit, UD-14A Power Unit, UD-16 Power Unit, UD-18 Power Unit, UD-18A Power Unit UD-24 Power Unit, UD-6 Power Unit, UD-370 Power Unit, UD-370 Dsl Power Unit, TD15 Crawler 150 and 151 Series, TD18A Diesel Crawler, TD18, TD20 Diesel Crawler,TD24 Diesel Crawler. UD-6 Power Unit, Adams 512 Diesel Grader, 412H Diesel Grader, 412 Diesel Grader and the 312 Diesel Grader.

Table of Contents

SECTION 1. CHARTS AND DATA

Ih b275 injector pump manual briggs and stratton

Diesel Fuel System Test Chart
Unit Replacement Chart
IH Diesel Fuel Injection Pump Service Chart
Introduction Dynamometer Testing of Rebuilt Engines
Procedures for Adjusting IH Injection Pumps on Engines During Dynmometer Run-in
Temperature and Barometric Correction Chart
Flow Bench Setting of IH Injection Pumps (Not Physical Dimension) (Charts 1 and 2)
Manifold Pressures , Exhaust Temperatures and Maximum Fuel Consumption

International B275 Injection Pump

Speed Charts:
Prior to MA” Pumps (Std. App.)
“A” Pumps (Std. App.)
“B” and “C” Pumps (Std. and Special App. )
Manufacturer Customer (“A” Pumps)
35 and 4U Series (“A” and “B” Pumps)
Manufacturer Customer (“B”and “C” Pumps)
Plunger Identification Chart
Governor Spring Assembly
Chart for Testing IH Single-Plunger Pumps on Bosch Test Stand
Altitude Deration
Fuel System Diagrams
Description
Special Tools
Specifications
Checking Mechanical Problems

SECTION 2. INJECTION NOZZLES AND INJECTORS

Nozzles
Description
Removal
Disassembly
Inspection and Repair
Reassembly
Installation
Testing Injection Nozzles R
econditioning Nozzle Valves

Injectors

Description and Operation
Removal
Testing Injectors Prior to Reconditioning With A Tester (Kiene) Disassembly
Inspection and Reconditioning
Reassembly
Installation
Field Check for Fuel Pipe Fitting Leaks (on Engine)

SECTION 3. IH FUEL INJECTION PUMPS

Ih B275 Injector Pump Manual Transmission

Removal (Complete Injection Pump)
Installation (Complete Injection Pump)
Timing Injection Pump to the Engine ”In Chassis’1 High Idle Speeds
Pump Timing Chart

SECTION 4. DISTRIBUTOR

Removal
Disassembly
Inspection and Repair Reassembly
Installation

SECTION 5. PLUNGER

Removal

Ih B275 Injector Pump Manual Diagram

Disassembly
Inspection and Repair
Reassembly
Installation

SECTION 6. PRIMARY PUMP

Description
Removal
Disassembly
Inspection and Repair
Reassembly
Leakage Test for Primary Pump
Installation

SECTION 7. TORQUE CONTROL AND GOVERNOR SPRING

Removal
Disassembly
Inspection and Repair
Reassembly
Installation

SECTION 8. SCAVENGING VALVE

Removal and Disassembly
Inspection and Repair
Reassembly and Installation

SECTION 9. CAMSHAFT

Removal
Disassembly
Inspection and Repair
Reassembly
Installation

SECTION 10. GOVERNOR SHAFT, RACK AND CONTROL LEVER

Removal
Disassembly
Inspection and Repair
Reassembly
Installation

SECTION 11. TESTING AND ADJUSTING INJECTION PUMPS WITH TEST STAND

Ih B275 Injector Pump ManualIh B275 Injector Pump Manual

The Injection Pump Test Stand
Mounting the Injection Pump on Allen Test Stand
Mounting 16 or 24 Series, IH Twin Plunger Injection Pump on Allen Test Stand
Mounting 18A Series IH Twin Plunger Injection
Pump on Allen Test Stand Mounting the Injection Pump on Bacharach YRS
Test Stand
Primary Pressure Test
Preparation for Dimensional Adjustments
Torque Lever Stop Screw Dimensional Adjustment
Torque Spring Shoe Screw Dimensional Adjustment
Torque Lever Pick Up or Limiting Screw (Overload Gap) Dimensional Adjustment
Shutoff Stop Screw Dimensional Adjustment
Equalizing the Racks on Twin Plunger Pumps Fuel Delivery Test (Not FOUR SPEED FLOW METHOD)
Rack Positive Shutoff Adjustment
Torque Arm Stop Screw Dimensional Adjustment (Maximum Fuel Delivery)
High Speed Stop Screw Dimensional Adjustment
Bumper Spring Dimensional Adjustment
Conversion Chart
Four Speed Flow Method (Not Physical Dimension)
Solid Torque Arm Adjustment (For Pumps so Equipped)
Check and Reverse Check Valve Leakage Test
Reverse Check Valve Opening Pressure
Fuel Return Check Valve Opening Pressure
Scavenging System Leakage Test (“A” Pumps and Prior Only)
Distributor Valve and Stem Leakage Test
Plunger Leakage
Test Flow Delivery Tolerances

SECTION 11 A. LEAKAGE TESTS WITH PUMP DISASSEMBLED (ON TEST STAND)

Distributor Valve and Seat Leakage Test
Distributor Valve, Bushing and Gasket Leakage Test
Check and Reverse Check Block Leakage Test
Reverse Check Valve Opening Pressure Test
Plunger Leakage Test

SECTION 12. TESTING DIESEL FUEL SYSTEMS ON THE ENGINE

Ih B275 Injector Pump Manual Briggs And Stratton

Injector

Ih B275 Injector Pump Manual Parts

General Instructions
Nozzle Leakage and Opening Pressure Test
Comparative and Primary Pump Pressure
Check and Reverse Check Valve Leakage Test
Reverse Check Valve Opening Pressure Test
Fuel Return Check Valve Opening Pressure Test
Scavenging System Leakage Test
Distributor Valve and Stem Leakage Test
Test for Plunger Leakage and Degrees of Pump Rotation Between Distributor Valve Opening, Plunger Port Closing, Plunger Port Opening, and Distributor Valve Closing
Test Chart
Field Adjustment of Governor and Torque Arm Assembly
Solid Torque Arm Torque Control Settings
Rack Adjustment of Twin Plunger Pumps Mounted on the Engine